For generator rental & temporary power, the service area covers roughly 100 miles from central Agua Dulce. Urgent requests can be submitted any time; response time depends on the local provider.
Common reasons to call
- A storm is in the Gulf and the business needs power lined up before landfall, not after
- Utility power is out and refrigeration, servers, or production cannot wait for restoration
- A permanent standby generator is down for repair and something has to cover the gap
- A job site has no utility service yet and crews need power for tools and trailers
- An outdoor event needs clean quiet power for stage, lighting, food service, and vendors
- A planned electrical shutdown means the building has to run on temporary power for a day or a week
- A new generator install needs load bank testing before it is accepted
- A plant or facility needs supplemental power during a turnaround or expansion
Typical work
- Deliver, set, fuel, and connect a towable diesel generator for storm or outage coverage
- Provide temporary power with distribution panels, spider boxes, and cable for a construction site
- Cover a planned electrical shutdown so a facility keeps running while the service is worked on
- Supply event power sized for stage, lighting, refrigeration, and vendor loads, often with a quiet unit
- Bridge a facility while a permanent standby generator is repaired or replaced
- Load bank testing to prove a generator carries its rated load before anyone depends on it
Typical turnaround
Off season, a unit is usually available within a day. During a named storm that changes completely, because inventory across the whole Gulf Coast commits days before landfall and stays committed for weeks after. The connection is the part that takes planning, since a code compliant tie in needs an electrician and, on most buildings, a transfer switch or tap box that should be installed long before the storm.
Materials and equipment
- Towable diesel generators, the common rental unit for storm, site, and event work
- Larger containerized and trailer mounted units for facility scale loads
- Distribution panels, spider boxes, cam lock cable, and cord sets to get power where it is needed
- Manual transfer switches and camlock tap boxes so a building can take temporary power safely
- Fuel tanks, fuel service, and load banks for testing
Job sizes
Minor
A small portable unit for a short outage, a trailer, or light tools
Standard
A towable diesel unit with distribution for a job site, a small business, or a weekend event
Major
Facility scale power covering refrigeration, production, or a planned shutdown, including cable, distribution, and fuel service
Replacement
Extended storm response, where the fuel, the service calls, and how long the unit is committed matter far more than the daily rate on the machine
Final pricing comes from the on-call provider after on-site assessment, with a written estimate before any work starts.
What to expect
- ✓Sizing based on your actual connected load and motor starting surge, not building square footage
- ✓Connection to a building made by a TDLR licensed electrician through a transfer switch or tap box
- ✓Fuel service responsibility stated in writing before the unit is delivered
- ✓Load bank testing available to prove a unit carries its rating before anything depends on it
Connections to building systems are made by electricians licensed through TDLR. Rental providers commonly carry general liability and commercial auto coverage, and crews working port and plant sites hold TWIC cards and site safety orientations. Units used in life safety or critical applications are typically load bank tested with the results documented.
Common questions
What size generator do I actually need?
It depends on load, not on building size, and the honest way to size it is to add up what has to run and account for the starting surge on motors. Air conditioning, refrigeration, and pumps draw far more starting than running, and a unit sized on running load alone will stall on startup. A provider who sizes without asking what equipment you have is guessing.
Can I just plug it into an outlet?
No. Backfeeding a building through an outlet energizes the utility service on the other side and can kill a lineman working to restore power, and it bypasses every protection in the panel. A generator connects to a building through a transfer switch or a permanently installed tap box, wired by a licensed electrician, so utility and generator power can never be connected at the same time.
When should I reserve one before a hurricane?
Before there is a storm to reserve it for. Rental fleets across the Gulf Coast commit as soon as a system enters the forecast cone, and by the time a watch is posted for the Coastal Bend, availability is largely gone and units are being pulled in from out of state. The businesses that stay running are the ones with a standing arrangement and a connection already installed.
Who supplies the fuel and who keeps it running?
Ask, and get it in writing, because it is the most common gap in a storm rental. A towable unit will run through its base tank in under a day at load, so somebody has to be refueling it. Some providers include scheduled fuel service and some hand you the keys. During a regional outage, fuel delivery is its own bottleneck separate from the generator.
Should I rent or buy a standby generator?
If the need is a known one time event, a shutdown, an event, or a construction period, rent. If losing power costs you money every time it happens, a permanently installed standby unit with an automatic transfer switch starts on its own at two in the morning and does not depend on anyone answering the phone during a regional emergency. A lot of businesses on the coast end up owning the standby and renting supplemental capacity on top.
What is load bank testing and do I need it?
A load bank applies artificial load so a generator can be proven at its rating without depending on the building. It is how a new install is accepted, how a standby unit is verified on a maintenance cycle, and how diesel units avoid the wet stacking that comes from running lightly loaded for long periods. If a generator protects something that matters, it should be tested under load rather than just started monthly.
Will a rental unit run my air conditioning?
Only if it was sized for it. Air conditioning is usually the single largest starting load in a small commercial building, and it is where undersized rentals fail. On the Coastal Bend, cooling is frequently the reason the generator is there at all, so name it specifically when you ask for a size instead of assuming it is included.
Coastal Bend seasons
Spring (March - May)
The right time to arrange storm season coverage, install a transfer switch or tap box, and load bank test a standby unit. Everything is available and nothing is urgent, which is exactly why almost nobody does it now.
Summer (June - August)
Heat drives cooling load, and a unit sized in mild weather may not carry an August afternoon. Early season storms start committing rental inventory, and construction and event demand runs at its peak.
Fall (September - November)
Peak hurricane season and the tightest supply of the year. Fleets commit days ahead of landfall, and after a storm units stay deployed for weeks while restoration works through the grid. Prices, availability, and fuel all move at once.
Winter (December - February)
Quietest rental season, best availability, and the best window for planned electrical shutdowns and facility work. A hard freeze on the coast can still cause grid strain, and cold starting a diesel that has sat unmaintained is when neglected units fail.